Image is not available
Image is not available
Image is not available
Image is not available
Image is not available
Image is not available
ArrowArrow
ArrowArrow
ArrowArrow
ArrowArrow
Slider

DASWELL light equipment is divided into three parts: concrete finishing machinery, asphalt & clay compaction machinery and mortar conveying & spraying machinery. The concrete finishing machinery includes: laser screed, vibratory screed, power trowel, concrete cutter, concrete vibrator, vibrator poker, polishing machine, floor grinder, road planer. The asphalt & clay compaction machinery includes: roller, plate compactor, light tower, tamping rammer. The mortar conveying & spraying machinery has one kind of machine, it is motor sprayer with two models.

Laser Screed

Vibratory Screed

Truss Screed

Ride-on Trowel

Walk-behind Power Trowel

Edger Trowel

Concrete Cutter

Concrete Vibrator

Vibrator Poker

Polishing Machine

Floor Grinder

Road Planer

Ride-on Roller

Vibratory Single-drum Roller

Vibratory Double-drum Roller

Light Tower

Reversible Plate

Plate Compactor

Tamping Rammer

Gasoline Tamping Rammer

Motor Sprayer

Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input

Latest News

On April 29 and April 30, 2021, DASWELL delivered one set of MADP40 mobile drum asphalt mixing plant to the port and will ship it to Southeast Asia.

On April 1, 2021, DASWELL loaded one set of ZL938 wheel loader and some spare parts into a 40HQ container and will ship it to Southeast Asia on April 5. The wheel loader is with 2.8ton rated load and 1.4m3 bucket size. It is equipped with Cummins engine as per customer’s requirements.

On April 7, 2021, DASWELL sent one 30m truck mounted concrete boom pump to the port. It was loaded on a 40FR at the port on April 10 and will be shipped to Southeast Asia on April 14. This truck mounted concrete boom pump is equipped with Dongfeng 4×2 chassis and 4 arms. It is very suitable for various projects.

On February 12th, we loaded goods for our North America client, he bought 3 sets of cement screw conveyors, a set of cement silo legs, some cement silo accessories.

On February 5, 2021, a double-nozzle dry-mix mortar packing machine of our company was loaded at the port, ready to be shipped to North African customers. The customer wants to package a dry powder mixture of quartz sand and gypsum powder.

On February 3rd, 2020, we loaded our ball mill plant secondary classification system and 3 sets of calcium carbonate packing machines to our North Africa customer.

On November 28, 2020, we loaded four sets of calcium carbonate packing machines and spare parts for ball mill plant and coating plant to our North Africa customers.

On September 16, 2020, DASWELL loaded one complete set of stone crushing plant into 5units of 40HQ containers and deliver it to the port successfully. It will be shipped to Southeast Asia on September 22. 

On July 8 and July 9, 2020, DASWELL loaded our MADP-40 mobile drum asphalt mixing plant into 5 units of 40HQ container successfully in our factory. It will be shipped to Southeast Asia on July 13.

On July 5th, 2020, one set of 13m mobile concrete placing boom was loaded in factory and will be shipped to South America.  

On May 20th, 2020, 3 sets of cement screw conveyors were loaded into a 20 feet container and will be shipped to America.

On Oct 16, 2019, DASWELL loaded 2 units of ZL938 wheel loader into a 40HQ container and will ship it to Southeast Asia.

On August 9th, 2019, one set of JZR350DH diesel engine concrete mixer and some spare parts were delivered to Africa.

On June 10, 2019, DASWELL shipped 4 sets of 8m3 transit mixer, 1 set of 37m truck mounted pumpcrete and one set of 5ton wheel loader to Southeast Asia successfully.

On April 17-18th, one full set of full automatic block production line was loaded in our factory and would be shipped to Asia. 

On April 25, 2019, DASWELL loaded one JZR500DH diesel concrete mixer into a 20GP container and sent to the port. This diesel concrete mixer will leave China and be shipped to Southeast Asia on April 30.

On 19th April, 2019, we delivered 14 sets of light equipment to south America.

On April 8, 2019, DASWELL loaded 2 sets of DFB4-20 block making machine and some other spare parts into a 40HQ container and delivered to the port successfully.

On November 7, we delivered 3 sets of JZR350DH diesel mixers to North America.

On Nov 6, 2018, DASWELL loaded one DFB4-26C block making machine and 12 dust collectors into a 40HQ container and sent it to South Amerca.

Contact Us

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Whatsapp: +8615690865532

Tel: +86-371-65669681

Fax: +86-371-55186675

No. 2 CBD, Zhengdong New District, Zhengzhou City, Henan Province, China

© 2021 Henan Daswell Machinery Co., Ltd Sitemap

豫ICP备19026268号